A switchboard is sold at a fixed price and built in scattered hours by several people. Until it has been delivered you do not know what it really cost, and by then it is too late to correct.
Quotation
The switchboard quoted by eye
You estimate the hours for design, assembly, wiring and testing from memory. If you are out by 20%, the margin on the switchboard goes with it.
With Horaxa you see: The actual hours of similar switchboards you have already built, so you can quote the next one with data.
Materials
Switchgear that leaves without being logged
MCBs, contactors, terminal blocks, cable and trunking leave the stores for several switchboards at once. Nobody knows which one each part was charged to.
With Horaxa you see: Every withdrawal charged to the switchboard that uses it, the stock left and an alert when it drops below the minimum.
Assembly
Fitter and mate hours not told apart
The wiring drags on, the customer changes the schematic halfway through assembly and the extra hours are not logged. You add them up from memory on Friday.
With Horaxa you see: Each switchboard's clock turns orange from 60% and you get an alert at 80%, while you can still talk to the customer.
Testing
The final documentation, at the last minute
Testing and the report are done once the switchboard is assembled, in hours nobody logs, and the document takes days to reach the customer.
With Horaxa you see: The testing hours within the same switchboard and the Word report on your template, written by the technician and delivered to you already finished.